Hiatus

Hiatus Post septic, there was a lull in activity. Not much happening on the lot apart from visits by some […]

Steel on hand

Steel on hand Steel for ICF arrived on the day of the septic installation. 200 lengths each of two sizes […]

Septic is in

Septic is in Much happened on Friday July 8. Gilles came early with Glenn and Stephane and installed the weeping […]