Hiatus Post septic, there was a lull in activity. Not much happening on the lot apart from visits by some […]
Revisions / blunders #1
Revisions / blunders #1 Going from virtual to actual is anxiety inducing. Though inevitable, you don’t want to come face-to-face […]
Steel on hand
Steel on hand Steel for ICF arrived on the day of the septic installation. 200 lengths each of two sizes […]
Septic is in
Septic is in Much happened on Friday July 8. Gilles came early with Glenn and Stephane and installed the weeping […]
Septic on its way
An immense sandbox Long awaited, the septic is getting done. The site was dug 2 weeks ago, and now the […]